National Repository of Grey Literature 2 records found  Search took 0.00 seconds. 
Reconstruction of the cable suspended footbridge in Kroměříž
Liška, Jaroslav ; Kulhavý,, Tomáš (referee) ; Klusáček, Ladislav (advisor)
The Diploma thesis deals with the reconstruction design of a footbridge in the city of Kroměříž, Czech Republic. The footbridge would serve as safe transport for pedestrians over the Morava river. The main objective of the thesis is to conceive two or three reconstruction designs. The most suitable one will be opted for and elaborated in more detail. Eventually, strengthening of the bridge by means of additional prestressing using mono-strand post-tensioning systems is picked as the best solution of the planned reconstruction. The monostrand post-tensioning system is led under the deck, the cross section being outside. External cables are anchored in concrete blocks built around existing supports. Load-generated internal forces are calculated on a spatial bar model with non-linear first-order analysis. The calculation is executed using the finite element method in the midas Civil programme. The chosen reconstruction design is then assessed against load capacity limit states, and functionality. Also, the designed reconstruction is assed for dynamic effects. Results are compared with existing structure, and verified against the real-time tensometric measurement-obtained data. Dimensions, assessment of load-bearing structure, and structural details are all made according to valid Eurocodes.
Reconstruction of the cable suspended footbridge in Kroměříž
Liška, Jaroslav ; Kulhavý,, Tomáš (referee) ; Klusáček, Ladislav (advisor)
The Diploma thesis deals with the reconstruction design of a footbridge in the city of Kroměříž, Czech Republic. The footbridge would serve as safe transport for pedestrians over the Morava river. The main objective of the thesis is to conceive two or three reconstruction designs. The most suitable one will be opted for and elaborated in more detail. Eventually, strengthening of the bridge by means of additional prestressing using mono-strand post-tensioning systems is picked as the best solution of the planned reconstruction. The monostrand post-tensioning system is led under the deck, the cross section being outside. External cables are anchored in concrete blocks built around existing supports. Load-generated internal forces are calculated on a spatial bar model with non-linear first-order analysis. The calculation is executed using the finite element method in the midas Civil programme. The chosen reconstruction design is then assessed against load capacity limit states, and functionality. Also, the designed reconstruction is assed for dynamic effects. Results are compared with existing structure, and verified against the real-time tensometric measurement-obtained data. Dimensions, assessment of load-bearing structure, and structural details are all made according to valid Eurocodes.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.